|
|
|
|
Plant Services Containment Services |
|
|
BCP Engineers can ensure your PWR or BWR plant meets all current NRC and ASME Section XI requirements pertaining to containment leak tight and structural integrity. 10CFR50, Appendix J Integrated and Local Leakage Rate Testing BCP professionals have directed over 60 Local and Integrated Leakage Rate Tests at 35 domestic and 10 foreign nuclear units. Through direct experience, authoritative knowledge of standards, and state-of-the-art proprietary software, BCP maintains a solid position in the nuclear industry and with NRC staff specialists and regional inspectors. BCP’s Appendix J Engineers have successfully performed Appendix J and other containment testing for BCP for more than two decades. Additionally, using BCP for your plant’s containment testing provides the added benefits of a minimum-duration test, with BCP’s advanced instrument placement techniques. And logistical problems are minimized since BCP provides a complete range of services, including Planning and Scheduling. BCP offers the following Appendix J services:
Containment In-Service Inspection BCP professionals have over 35 years experience in developing and implementing containment in-service inspection programs. This experience includes the preparation of program documents as well as the performance and direction of inspections and Repair / Replacement work at numerous plants in the US and Asia. Through service on ASME Section XI working groups, BCP Engineers have participated in the development of requirements for in-service inspection of both concrete and metal containment. BCP offers the following Containment In-Service Inspection Services:
| |
|
BCP Engineering & Consulting |
For more information on BCP's Containment Services, please contact: Tony Stough BCP Plant Services 1715 S. Missouri Avenue, Suite 2 Clearwater, Florida 33756 Phone: (727) 581-9594 Fax: (727) 584-1375 Cell: (727) 415-1959 Email: aws@bcpengineers.com |
|
Please report any problems with this website to Webmaster |
|